Quality Roof Detailing 101

The flashing of the head of a batten seam roof at a wall is shown in this detail. The top of the roof pan is formed into a "bread pan" whose upper edge is just above the finished batten. Copper flashing is locked into this edge, and extends at least 8" up the wall. A copper receiver holds the counterflashing at its top edge. Counter Flashings. ATAS offers two styles of Counter Flashing; a 2-piece system with receiver and snap-in skirt, or an economical 1-piece system. Both the 2-piece and 1-piece counter flashings are available as surface mount, reglet, or through wall. Counter Flashing is provided in 12′-0″ lengths, pre-punched for fasteners, and is available.

2 Piece Counter Flashing Architectural Products

Title: 3-3A Surface Mounted Counter Flashing Detail Author: Sika USA Created Date: 2/4/2019 2:13:52 PM SOPREMA® Counter Flashing is designed to provide a watertight termination at the leading edge of the roofing material. SOPREMA Counter Flashings are manufactured in 12 foot lengths with pre-punched notched holes for quicker installation. Slotted fastening holes allow for proper thermal movement of the materials and ensure correct fastener. Securement. Counterflashings are secured in their reglets with lead wedges (rolled, 4-pound lead sheets) tapped into position to create a friction fit. Lead wedges typically are spaced 12 inches on center and a minimum of two per counter-flashing. If the counterflashing moves under hand pressure, add wedges as needed. Watertight Termination Whenever Needed. Metal-Era's counterflashing products provide a watertight termination at the leading edge of the roofing material. We offer a variety of 1-piece and 2-piece versions to meet your needs.

Roof Tech Talk January 2014

Base Flashing 2PC Counter Flashing-Base Flashing. Detail Drawing (PDF) DWG - 244 KB (en) Edge Metal Flashing. Detail Drawing (PDF) DWG - 241 KB (en). Flashing Details PDF Files. PDF Files. LAM Overflow Drain Flashing. Detail Drawing (PDF) PDF - 206 KB (en) LAM Thru Wall Duct Flashing. Two-piece counter flashing system with surface mounted reglet / receiver punched for fastening 12" on center. Snap-on metal skirt flashing can. reglet and flashing details are usually fabricated with an .050" (1.25 mm) reglet head and an .032" (0.80 mm) flashing. Special colors or finishes are available. Finish setups Surface Mounted Counter Flashing. Reglets and counter flashings provide a watertight protection along parapet wall termination that delivers a professional appearance. Available as a 1 or 2-Piece system and surface mount.. Details. Curbs / Walls. BASE FLASHING - MODBIT OPTION 1. 1 Piece Counter Flashing Surface Print Approval; ANSI/SPRI/FM 4435/ES-1 Calculator. Enter the building characteristics to calculate the design pressure your roof edge will need to meet or exceed in order to comply with ANSI/SPRI/FM 4435/ES-1. This calculator will also provide the basic wind speed for your region and a list of recommended Metal.

Counter Flashing Architectural Products

Weep holes or open head joints should be located a maximum of 32 in. (813 mm) apart. Flashing at lintels and sills (shown in Figures 2 and 3, respectively) is very similar. Although not shown, vents can be installed in the vertical head joints at the top of masonry walls to provide natural convective air flow within the cavity to facilitate. 2-Piece. Carlisle's 2-piece Surface Mounted Counterflashing is easily installed by hooking and rotating the flashing to snap into the receiver. It provides a watertight termination at the leading edge of the roofing material. This reglet can be taken apart for easy roof repairs. Request A Quote. 2-Piece. Carlisle's 2-piece Surface Mounted Counterflashing is easily installed by hooking and rotating the flashing to snap into the receiver. It provides a watertight termination at the leading edge of the roofing material. This reglet can be taken apart for easy roof repairs. Request A Quote. Everybody Needs a Roof: Base Flashing. Counter flashing is the final layer of a three-part waterproof barrier installed between a roof and a vertical wall or chimney. The first two layers are called base flashing and step flashing. The term reglet flashing refers to an installation method for counter flashing, not a separate layer.

Flashing Details Counter Flashing with Kick Out ARCA Construction

TPO DETAILS Detail # PDF DWG Detail Name GF EZ TPO 1.01 PDF DWG Termination Bar GF EZ TPO 1.02 PDF DWG Termination Bar with Counter Flashing GF EZ TPO 1.03 PDF DWG Common Counter Flashing & Membrane Securement GF EZ TPO 1.04 PDF DWG Coping Termination Over Membrane Flashing GF EZ TPO 1.05 […] Counter flashing is very important anywhere you have brick on a home. This is usually on the roof and chimney areas. With this in mind, sometimes it is not installed or it wears out quickly and needs replacing. In general, the idea is to always keep water outside of the home. We will look at your chimney during home inspections in Chicago and.