BBS of footing Bar Bending Schedule for footing Engineering Tactics YouTube

🕑 Reading time: 1 minuteBar bending schedule (BBS) of an concrete footing provides the reinforcement details and the total steel quantity required for the footing construction. The BBS and quantity of steel reinforcement required for a simply isolated footing are calculated and explained by means of a workout example. Calculation of Steel Reinforcement For Isolated […] Plain mesh is adopted for F1, F4, F7 footings. Dia of X Bars is 16mm (Dia 16mm @ 100mm C/C) Dia of Y Bars is 12mm (Dia 12mm @ 100mm C/C) which means Center to center spacing between X bars & Y bars is 100mm. Remember, Proper Concrete cover should be adopted for the reinforcement in Footings to resist it from corrosion.

BBS Of Footing Cutting Length, Numbers of bars in Footing Excel Sheet YouTube

#RCC #Footing #Calculation #BBS SteelBar Bending Schedule of Footing - How to Calculate Quantity of Steel in RCC Footing?Start Your TRAINING NOWEnroll and ge. Here you can see below the reinforcement detail of an isolated footing. The total length and width of a column are 2000 millimeters and 1500 millimeters respectively. The height of footing is 300 millimeters. Now let us calculate bar bending schedule for footing step by step. In BBS of footing, one is going to obtain the numbers of bars having distinct lengths as well as sizes in both y axis as well as x axis together with the cutting length to finish a footing. The computation is carried out on the basis of the subsequent dimensions: #BBS #Footing #EngineeringTacticsIn this video I explained BBS of footing.Bar Bending Schedule for footing.How to Calculate steel Quantity of footing.Enginee.

BBS OF FOOTING INCLUDING COLUMN UP TO PEDESTAL YouTube

In BBS of footing, you will get the numbers of bars with different lengths and sizes in both x axis and y axis along with the cutting length to complete a footing. The calculation is done based on the following dimensions :-. The size of footing = 1 m x 1.2 m. Spacing of bar = 100 cm C/c. Footing cover = 50 mm. First of write the dimension of the structure. Note down the diameter of steel bars for which. cutting length is to be calculated. Now, deduct the concrete cover or clear cover to get. actual length of perimeter bars. Calculate the length of the hook of the bars. Calculate the bend length of steel bars. Add step 3 and 4 and subtract step 5 from it. Isolated footings Bar Bending Schedule | F3, F8. For the calculation of the total quantity of steel required for the Isolated footing, we are adopting below dimensions for bars. Dimensions of Footing are 0.9×0.9×0.5 (Length × Breadth × Depth) which means Center to center spacing between X bars is 100mm & Y bars is 90mm. bar bending schedule of footing, calculating the weight of rebar in footing, estimating reinforcement bars for column footings.. Now, we will prepare BBS of the footing, from calculated data. sl bar dia. no. length total weight total no. type mm. in m..

Footing Reinforcement BBS of Column Footing Calculation in Details YouTube

BBS Footing: Given data : Footing Lengths are 2000 mm long, 1500 mm wide, and 300 mm deep. Diameter of rebar is 12 mm. There is a 50 mm cover on all sides with a 150 mm spacing. number of bars running along the x-axis = [{(footing length) - (2 cover) / spacing}] + 1 calculate total requirement of reinforcement (steel) for the BBS of footing. Total weight = Wm + Wd. Total weight = 14.016 kg + 14.2 kg. Total weight = 28.216 kg. BBS of footing and estimation of Steel quantity containing main bar and distribution bar diameter of 12 mm reinforcement and footing dimension is 4'×5'. In this video we learn about how to prepare column footing BBS (Bar Bending Schedule) or we can say that how to calculate quantity of steel in footing or fou. In this post you can learn simple rectangular footing BBS (Bar Bending Schedule) Just Follow 4 Step one by one. How to make BBS on Rectangular Footing. Calculate BBS of Footing Just 4 Step. Given Data From Footing Drawing. Footing Size = 1 m x 1.2 m Spacing of Bar = 100 mm C/c Footing Cover = 50 mm Bar Use in Footing = 12 mm . Step- 1

BBS OF DOUBLE MESH FOOTING BY CIVIL GURUJI YouTube

The BBS of footing also includes information about the cover, which is the distance between the reinforcement bars and the surface of the concrete. This cover is essential to protect the bars from corrosion and other environmental factors. The cover specified in the BBS should comply with the design requirements and local building codes. BBS OF FOOTING & PEDESTALSteel Calculation & Bars Cutting*****Civil & Structural Knowledge